1-banner.jpg

Professional Forklift Manufacturer That Provides OEM Services

Water tank drain pipe
Water tank drain pipe
Water tank drain pipe
Water tank drain pipe
Water tank drain pipe
Water tank drain pipe
Water tank drain pipe
Water tank drain pipe
MOQ:
1
Quantity(pieces):
1
Product details
Essential details
Quantity(pieces):1
MOQ:1
Product Introduction
Length: 43 cm, Maximum diameter: 4.7 cm, Minimum diameter: 4.2 cm
It is a rubber tube that connects the water outlet at the bottom of the water tank and the water inlet of the engine. 

1. Transport the cooled water back to the engine
After the hot water is cooled by being blown by the fan in the water tank, the cooled water flows out from the bottom of the water tank and passes through this lower pipe, returning to the engine water jacket. 

2. Complete the cooling cycle
Return to the engine's cold water, absorb heat again, and then heat up before flowing out through the upper water pipe. This forms a complete cycle.
Copyright ©️ 2026 Qingdao Bonjour Shengrong Intelligent Technology Co.,Ltd. All Rights Reserved.

About us

Products

News

Contact Information

Email: erica@bonjourmachinery.com

WhatsApp: +86-15254276749

Telephone: +86-15254276749

Factory: Qingdao YangFT Intelligent Equipment CO., LTD.

Address: No.18,Pingan Road,Jiaoxi District,Jiaozhou,Qingdao,China


Direct sales company: Qingdao Bonjour Shengrong Intelligent Technology Co.,Ltd.

Address: Room 202, No. 381, Dunhua Road, Shibei District, Qingdao,Shandong, China

卓悦英文LOGO主白_画板 1.png